Friday 2 December 2011

Advent Calendar Day 2

The ornament for Day 2 was a challenge as it involved knitting in the round on double-pointed needles - something that I'm not very good at as I usually end up with gappy stitches. So I decided to design my own bauble, based on Day 2 of the DROPS Christmas Calendar, but using normal knitting needles.
I left the reverse of the bauble blank for the number 2.
I used the same DK yarns for this decoration as I did for the mitten yesterday and I used 3.75mm needles.
P = Purl K=Knit R = Red W = White St/s = Stitch/es Tog = Together
M1 = Make one by picking up loop between stitches and knitting/purling into the back of it.
WRW = 1 stitch each of White, Red, White to form stripe.
Cast on 6 sts leaving a tail long enough to sew up seam.
Row 1 - Purl
Row 2 - (K1, M1)x5, K1 = 11 sts.
Row 3 - Purl
Row 4 - (K1, M1)x10, K1 = 21 sts.
Row 5 - Purl
Row 6 - K1, M1, K1, M1, K2, M1 to last st, K1 = 36 sts.
Row 7 - P18, M1, P18 = 37 sts.
Pattern Rows:-
Row 8 - K 2R, WRW, 5R, 1W, 3R, 1W, 5R, WRW, 14R.
Row 9 - P 14R, WRW, 5R, 2W, 1R, 2W, 5R, WRW, 2R.
Row 10 - K 2R, WRW, 5R, 5W, 5R, WRW, 14R.
Row 11 - P 14R, WRW, 5R, 5W, 5R, WRW, 2R.
Row 12 - K 2R, WRW, 1R, 4W, 1R, 3W, 1R, 4W, 1R, WRW, 14R.
Row 13 - P 14R, WRW, 2R, 4W, 3R, 4W, 2R, WRW, 2R.
Row 14 - K 2R, WRW, 3R, 3W, 1R, 1W, 1R, 3W, 3R, WRW, 14R. (1W = centre)
Row 15 - P Repeat Row 13.
Row 16 - K Repeat Row 12.
Row 17 - P Repeat Row 11.
Row 18 - K Repeat Row 10.
Row 19 - P Repeat Row 9.
Row 20 - Repeat Row 8.
End of Pattern rows, continue in red only for decrease rows.
R0w 21 - P18, P2tog, P17 = 36 sts.
Row 22 - *K2tog, K2tog, K1* Repeat *to* to last 2 sts, K2tog = 21 sts.
Row 23 - *K2tog* Repeat *to* to last 1 st, K1 = 11 sts.
Row 24 - Purl
Row 25 - *K2tog* Repeat *to* to last 1 st, K1 = 6 sts.
Cut thread leaving a tail of approx 30 cms and thread tail through remaining 6 stitches and draw up tight. Use casting on tail to draw up cast on stitches and sew up seam. Using a 4mm crochet hook work 16 chains out of top tail and slip stitch to form a loop. Fasten off ends.

I have just viewed Day 3 and it is a pair of socks! I had thought that the calendar would be all decorations, so I will try to adapt tomorrow's design.
Pj x

No comments: